Bridge structures built by
WKS Grybów








Construction works on the Katowice Szopienice Południowe – Katowice – Katowice Piotrowice section, as part of the project “Works on the main passenger railway lines (E30 and E65) in the Silesia region”.
Structures delivered for INTOP S.A.
Railway viaducts: WK-3, WK-9.1, WK-10, WK-21, WK-22 and footbridge KP-1a.






Construction works as part of the project “Reconstruction of the WK-05 viaduct at Gdynia Port station”.
Structure delivered for TRAKCJA S.A.









Construction works as part of the project “Construction of the new Podłęże – Szczyrzyc – Tymbark/Mszana Dolna railway line and modernisation of the existing railway line no. 104 Chabówka – Nowy Sącz”.
Structure delivered for INTOP S.A.




Demolition, reconstruction, expansion and construction of a building structure entitled: “Railway line No. 104 Chabówka – Nowy Sącz on section E from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652) together with technical infrastructure along railway line No. 104 on the section from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652), along railway line No. 96 Tarnów – Leluchów on section from existing km 87+700 to existing km 90+345 and at Nowy Sącz station

Design and execution of works for the reconstruction of the bridge in Przemyśl, at km 243.845 of railway line No. 91 Kraków Główny – Medyka as part of the project: “Improvement of the technical condition of engineering structures – Stage II”

Design and execution of works for the task entitled “Reconstruction of the bridge at km 1+968 of railway line No. 22” implemented as part of the project entitled: Works on railway line No. 22 and 25 on the section Gałkówek – Tomaszów Mazowiecki – Radom and on adjacent connecting lines







Demolition, reconstruction, expansion and construction of a building structure entitled: “Railway line No. 104 Chabówka – Nowy Sącz on section E from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652) together with technical infrastructure along railway line No. 104 on the section from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652), along railway line No. 96 Tarnów – Leluchów on section from existing km 87+700 to existing km 90+345 and at Nowy Sącz station




Demolition, reconstruction, expansion and construction of a building structure entitled: “Railway line No. 104 Chabówka – Nowy Sącz on section E from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652) together with technical infrastructure along railway line No. 104 on the section from km 61+220 (existing km 63+965) to km 73+892 (existing km 76+652), along railway line No. 96 Tarnów – Leluchów on section from existing km 87+700 to existing km 90+345 and at Nowy Sącz station